DFS Monitorkilowatts.io
← 2026-09

9 Sep 2026

Turn Down

NESO called a Turn Down event on 9 Sep 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 489.3 MW was procured against a 500.0 MW requirement (98% fill rate), with 12 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
489.3 MW
98% of requirement
Bid Cost
£50.7k
Bids
302 / 342
accepted / total
Participants
12

Accepted Volume by Participant

Aggregated across 10 half-hour periods, sorted by accepted volume

All bids rejected (2)
OCTOPUS 241.8 MW @ £300/MWhDRAX 52.0 MW @ £612/MWh

Half-Hour Periods

17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
447.7 MW
£92.6k£207/MWh
EQUIWATT LIMITED
19.2 MW
£4.5k£235/MWh
HILDEBRAND TECHNOLOGY LIMITED
12.0 MW
£2.4k£201/MWh
GRIDIMP LIMITED
4.8 MW
£720£150/MWh
AXLE ENERGY LIMITED
2.2 MW
£473£215/MWh
U ENERGY GROUP LIMITED
1.5 MW
£334£224/MWh
Shuffle Energy Limited
1.0 MW
£175£175/MWh
OAKTREE POWER LIMITED
0.6 MW0.6 MW rejected
£152£253/MWh
Bryt Energy Limited
0.2 MW
£32£160/MWh
GRIDVOLT UK LIMITED
0.1 MW
£18£180/MWh
OCTOPUS ENERGY LIMITED
0.0 MW241.8 MW rejected
£0£300/MWhrej
DRAX ENERGY SOLUTIONS LIMITED
0.0 MW52.0 MW rejected
£0£917/MWhrej