NESO called a Turn Down event on 6 Oct 2026, running from 16:00 to 22:00 across 12 half-hour settlement periods. 809.4 MW was procured against a 300.0 MW requirement (270% fill rate), with 12 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
809.4 MW
270% of requirement
Bid Cost
£89.5k
Bids
292 / 341
accepted / total
Participants
12
Accepted Volume by Participant
Aggregated across 12 half-hour periods, sorted by accepted volume
All bids rejected (1)
AXLE 15.9 MW @ £903/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 300.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 476.1 MW | £107.5k | £226/MWh |
| OCTOPUS ENERGY LIMITED | 263.9 MW | £55.4k | £210/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 31.0 MW | £7.1k | £226/MWh |
| ENGIE POWER LIMITED | 27.6 MW | £6.6k | £239/MWh |
| EQUIWATT LIMITED | 5.2 MW14.0 MW rejected | £1.2k | £228/MWh |
| U ENERGY GROUP LIMITED | 1.9 MW | £458 | £236/MWh |
| Shuffle Energy Limited | 1.1 MW0.1 MW rejected | £245 | £223/MWh |
| GRIDVOLT UK LIMITED | 1.1 MW | £243 | £221/MWh |
| OAKTREE POWER LIMITED | 0.9 MW0.3 MW rejected | £286 | £318/MWh |
| GRIDIMP LIMITED | 0.4 MW | £60 | £150/MWh |
| Bryt Energy Limited | 0.2 MW | £36 | £180/MWh |
| AXLE ENERGY LIMITED | 0.0 MW15.9 MW rejected | £0 | £903/MWhrej |