NESO called a Turn Up event on 8 Oct 2026, running from 19:00 to 23:00 across 8 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 41
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (3)
OCTOPUS 93.9 MW @ £60/MWhHILDEBRAND 2.4 MW @ £45/MWhGRIDVOLT 1.3 MW @ £136/MWh
Half-Hour Periods
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 0.0 MW93.9 MW rejected | £0 | £60/MWhrej |
| HILDEBRAND TECHNOLOGY LIMITED | 0.0 MW2.4 MW rejected | £0 | £45/MWhrej |
| GRIDVOLT UK LIMITED | 0.0 MW1.3 MW rejected | £0 | £125/MWhrej |