NESO called a Turn Down event on 11 Oct 2026, running from 16:00 to 20:00 across 8 half-hour settlement periods. 25.0 MW was procured against a 500.0 MW requirement (5% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
25.0 MW
5% of requirement
Bid Cost
£2.6k
Bids
119 / 119
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 21.9 MW | £4.5k | £207/MWh |
| U ENERGY GROUP LIMITED | 1.6 MW | £291 | £182/MWh |
| GRIDVOLT UK LIMITED | 1.5 MW | £302 | £201/MWh |