NESO called a Turn Down event on 11 Oct 2026, running from 16:00 to 20:00 across 8 half-hour settlement periods. 25.0 MW was procured against a 500.0 MW requirement (5% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
25.0 MW
5% of requirement
Bid Cost
£2.6k
Bids
119 / 119
accepted / total
Participants
3

Accepted Volume by Participant

Aggregated across 8 half-hour periods, sorted by accepted volume

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
HILDEBRAND TECHNOLOGY LIMITED
21.9 MW
£4.5k£207/MWh
U ENERGY GROUP LIMITED
1.6 MW
£291£182/MWh
GRIDVOLT UK LIMITED
1.5 MW
£302£201/MWh