10 Oct 2026

Turn UpTurn Up

NESO called a Turn Up event on 10 Oct 2026, running from 16:00 to 16:00 across 24 half-hour settlement periods. 3.5 MW was procured against a 500.0 MW requirement (1% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
3.5 MW
1% of requirement
Bid Cost
£45
Bids
35 / 53
accepted / total
Participants
3

Accepted Volume by Participant

Aggregated across 24 half-hour periods, sorted by accepted volume

All bids rejected (1)
GRIDIMP 0.4 MW @ £150/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
HILDEBRAND TECHNOLOGY LIMITED
3.0 MW
£63£21/MWh
GRIDVOLT UK LIMITED
0.5 MW1.6 MW rejected
£27£53/MWh
GRIDIMP LIMITED
0.0 MW0.4 MW rejected
£0£150/MWhrej