NESO called a Turn Up event on 10 Oct 2026, running from 16:00 to 16:00 across 24 half-hour settlement periods. 3.5 MW was procured against a 500.0 MW requirement (1% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
3.5 MW
1% of requirement
Bid Cost
£45
Bids
35 / 53
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 24 half-hour periods, sorted by accepted volume
All bids rejected (1)
GRIDIMP 0.4 MW @ £150/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 3.0 MW | £63 | £21/MWh |
| GRIDVOLT UK LIMITED | 0.5 MW1.6 MW rejected | £27 | £53/MWh |
| GRIDIMP LIMITED | 0.0 MW0.4 MW rejected | £0 | £150/MWhrej |