27 Oct 2026

Turn DownTurn UpTurn Up

NESO called a Turn Down event on 27 Oct 2026, running from 16:00 to 16:00 across 36 half-hour settlement periods. 824.8 MW was procured against a 500.0 MW requirement (165% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
824.8 MW
165% of requirement
Bid Cost
£89.1k
Bids
328 / 328
accepted / total
Participants
10

Accepted Volume by Participant

Aggregated across 36 half-hour periods, sorted by accepted volume

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
377.5 MW
£77.5k£203/MWh
OCTOPUS ENERGY LIMITED
329.9 MW
£75.9k£230/MWh
AXLE ENERGY LIMITED
38.7 MW
£9.5k£247/MWh
HILDEBRAND TECHNOLOGY LIMITED
30.8 MW
£6.2k£180/MWh
ENGIE POWER LIMITED
27.6 MW
£4.9k£177/MWh
EQUIWATT LIMITED
16.0 MW
£3.6k£225/MWh
Shuffle Energy Limited
2.2 MW
£326£148/MWh
U ENERGY GROUP LIMITED
1.1 MW
£230£209/MWh
GRIDVOLT UK LIMITED
0.8 MW
£37£46/MWh
Bryt Energy Limited
0.2 MW
£47£235/MWh