NESO called a Turn Up event on 28 Oct 2026, running from 16:00 to 16:00 across 36 half-hour settlement periods. 525.6 MW was procured against a 500.0 MW requirement (105% fill rate), with 8 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
525.6 MW
105% of requirement
Bid Cost
£52.5k
Bids
189 / 400
accepted / total
Participants
8
Accepted Volume by Participant
Aggregated across 36 half-hour periods, sorted by accepted volume
All bids rejected (3)
OCTOPUS 442.5 MW @ £177/MWhEQUIWATT 22.2 MW @ £312/MWhGRIDVOLT 1.9 MW @ £45/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
15:00
15:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 255.4 MW | £55.5k | £213/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 245.0 MW | £44.1k | £180/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 22.9 MW17.7 MW rejected | £4.9k | £210/MWh |
| Shuffle Energy Limited | 1.4 MW2.2 MW rejected | £280 | £200/MWh |
| U ENERGY GROUP LIMITED | 0.9 MW | £196 | £218/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW442.5 MW rejected | £0 | £186/MWhrej |
| EQUIWATT LIMITED | 0.0 MW22.2 MW rejected | £0 | £312/MWhrej |
| GRIDVOLT UK LIMITED | 0.0 MW1.9 MW rejected | £0 | £45/MWhrej |