NESO called a Turn Down event on 2 Nov 2026, running from 16:00 to 23:00 across 14 half-hour settlement periods. 419.2 MW was procured against a 220.0 MW requirement (191% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
220.0 MW
Procured
419.2 MW
191% of requirement
Bid Cost
£50.6k
Bids
296 / 298
accepted / total
Participants
9
Accepted Volume by Participant
Aggregated across 14 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 220.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 278.3 MW | £66.4k | £229/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 50.5 MW | £11.6k | £228/MWh |
| AXLE ENERGY LIMITED | 38.7 MW | £11.2k | £291/MWh |
| ENGIE POWER LIMITED | 32.2 MW | £6.8k | £211/MWh |
| EQUIWATT LIMITED | 16.0 MW | £4.3k | £270/MWh |
| Shuffle Energy Limited | 1.4 MW | £316 | £226/MWh |
| U ENERGY GROUP LIMITED | 1.2 MW0.2 MW rejected | £305 | £254/MWh |
| OAKTREE POWER LIMITED | 0.8 MW | £216 | £270/MWh |
| Bryt Energy Limited | 0.1 MW | £18 | £180/MWh |