NESO called a Turn Down event on 1 Nov 2026, running from 16:00 to 21:00 across 10 half-hour settlement periods. 42.4 MW was procured against a 500.0 MW requirement (8% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
42.4 MW
8% of requirement
Bid Cost
£5.0k
Bids
134 / 134
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 39.9 MW | £9.4k | £234/MWh |
| GRIDVOLT UK LIMITED | 1.4 MW | £311 | £222/MWh |
| U ENERGY GROUP LIMITED | 1.0 MW | £234 | £234/MWh |
| Shuffle Energy Limited | 0.1 MW | £21 | £210/MWh |