NESO called a Turn Down event on 8 Nov 2026, running from 16:00 to 21:00 across 10 half-hour settlement periods. 67.6 MW was procured against a 500.0 MW requirement (14% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
67.6 MW
14% of requirement
Bid Cost
£8.4k
Bids
123 / 123
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 64.3 MW | £16.1k | £249/MWh |
| GRIDVOLT UK LIMITED | 1.3 MW | £317 | £244/MWh |
| Shuffle Energy Limited | 1.0 MW | £200 | £200/MWh |
| U ENERGY GROUP LIMITED | 1.0 MW | £254 | £254/MWh |