DFS Monitorkilowatts.io
← 2026-11

9 Nov 2026

Turn DownTurn DownTurn Down

NESO called a Turn Down event on 9 Nov 2026, running from 16:00 to 16:00 across 18 half-hour settlement periods. 905.2 MW was procured against a 500.0 MW requirement (181% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
905.2 MW
181% of requirement
Bid Cost
£165.7k
Bids
201 / 229
accepted / total
Participants
10

Accepted Volume by Participant

Aggregated across 18 half-hour periods, sorted by accepted volume

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
16:00
16:30
17:00
17:30
18:00
18:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
360.4 MW
£124.4k£338/MWh
OCTOPUS ENERGY LIMITED
315.3 MW
£132.1k£411/MWh
DRAX ENERGY SOLUTIONS LIMITED
142.0 MW
£43.4k£305/MWh
HILDEBRAND TECHNOLOGY LIMITED
62.8 MW
£19.3k£305/MWh
ENGIE POWER LIMITED
13.8 MW
£5.6k£404/MWh
AXLE ENERGY LIMITED
6.7 MW
£4.6k£680/MWh
EQUIWATT LIMITED
2.4 MW12.4 MW rejected
£1.6k£650/MWh
U ENERGY GROUP LIMITED
1.0 MW
£365£365/MWh
GRIDVOLT UK LIMITED
0.7 MW
£225£321/MWh
Bryt Energy Limited
0.1 MW
£35£350/MWh