NESO called a Turn Down event on 10 Nov 2026, running from 16:00 to 16:00 across 30 half-hour settlement periods. 542.9 MW was procured against a 500.0 MW requirement (109% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
542.9 MW
109% of requirement
Bid Cost
£78.4k
Bids
255 / 320
accepted / total
Participants
10
Accepted Volume by Participant
Aggregated across 30 half-hour periods, sorted by accepted volume
All bids rejected (1)
AXLE 41.8 MW @ £467/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 352.2 MW60.9 MW rejected | £107.5k | £300/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 85.0 MW | £18.7k | £220/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 84.0 MW | £23.3k | £276/MWh |
| ENGIE POWER LIMITED | 11.5 MW11.5 MW rejected | £4.3k | £377/MWh |
| EQUIWATT LIMITED | 6.6 MW10.4 MW rejected | £2.0k | £300/MWh |
| GRIDVOLT UK LIMITED | 1.6 MW0.4 MW rejected | £462 | £289/MWh |
| Shuffle Energy Limited | 1.0 MW | £200 | £200/MWh |
| U ENERGY GROUP LIMITED | 0.6 MW0.4 MW rejected | £186 | £310/MWh |
| Bryt Energy Limited | 0.4 MW | £110 | £275/MWh |
| AXLE ENERGY LIMITED | 0.0 MW41.8 MW rejected | £0 | £433/MWhrej |