NESO called a Turn Down event on 3 Dec 2024, running from 16:00 to 19:00 across 6 half-hour settlement periods. 31.0 MW was procured against a 500.0 MW requirement (6% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
31.0 MW
6% of requirement
Bid Cost
£8.4k
Bids
10 / 10
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| AXLE ENERGY LIMITED | 19.0 MW | £10.9k | £572/MWh |
| GRIDIMP LTD | 12.0 MW | £6.0k | £500/MWh |