NESO called a Turn Down event on 4 Dec 2024, running from 16:00 to 19:00 across 6 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 49
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (5)
INFINIS 150.0 MW @ £492/MWhGRIDIMP 24.0 MW @ £550/MWhAXLE 14.0 MW @ £643/MWhCUB 9.0 MW @ £600/MWhEQUIWATT 3.0 MW @ £590/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 0.0 MW150.0 MW rejected | £0 | £492/MWhrej |
| GRIDIMP LTD | 0.0 MW24.0 MW rejected | £0 | £550/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW14.0 MW rejected | £0 | £643/MWhrej |
| CUB (UK) LTD | 0.0 MW9.0 MW rejected | £0 | £600/MWhrej |
| EQUIWATT LIMITED | 0.0 MW3.0 MW rejected | £0 | £590/MWhrej |