← Overview
Dec 2024
DFS events called during Dec 2024, part of the winter Turn Down season. NESO called 12 events this month, of which 6 resulted in procured volume. Each event below shows the time window, volume procured versus requirement, cost, and number of participants. Click any event to see the full bid-level breakdown.
Event Days
12
6 with volume
Procured
653.0 MW
Settled Cost
£118.5k
Avg Price
£467/MWh
Events
30 Dec 202416:00–19:00Turn Down
0.0 MW procured of 500.0 MW · £0 · 4 participants · 0 accepted / 52 rejected
29 Dec 202416:00–19:00Turn Down
0.0 MW procured of 400.0 MW · £0 · 3 participants · 0 accepted / 42 rejected
27 Dec 202417:00–19:00Turn Down
118.0 MW procured of 300.0 MW · £6.5k · 5 participants · 22 accepted / 12 rejected · £110/MWh
39%
13 Dec 202416:00–18:00Turn Down
0.0 MW procured of 500.0 MW · £0 · 9 participants · 0 accepted / 48 rejected
12 Dec 202416:00–19:00Turn Down
143.0 MW procured of 500.0 MW · £33.2k · 10 participants · 38 accepted / 51 rejected · £464/MWh
29%
11 Dec 202416:00–19:00Turn Down
349.0 MW procured of 500.0 MW · £103.6k · 9 participants · 70 accepted / 0 rejected · £594/MWh
70%
10 Dec 202416:00–19:00Turn Down
6.0 MW procured of 500.0 MW · £375 · 9 participants · 6 accepted / 61 rejected · £125/MWh
1%
9 Dec 202416:00–19:00Turn Down
6.0 MW procured of 500.0 MW · £370 · 7 participants · 6 accepted / 49 rejected · £123/MWh
1%
6 Dec 202416:00–19:00Turn Down
0.0 MW procured of 500.0 MW · £0 · 4 participants · 0 accepted / 17 rejected
4 Dec 202416:00–19:00Turn Down
0.0 MW procured of 500.0 MW · £0 · 5 participants · 0 accepted / 49 rejected
3 Dec 202416:00–19:00Turn Down
31.0 MW procured of 500.0 MW · £8.4k · 2 participants · 10 accepted / 0 rejected · £544/MWh
6%
2 Dec 202416:00–19:00Turn Down
0.0 MW procured of 500.0 MW · £0 · 2 participants · 0 accepted / 10 rejected
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 248.0 MW914.0 MW rejected | £72.2k | £326/MWh |
| OCTOPUS ENERGY LIMITED | 168.0 MW665.5 MW rejected | £126.0k | £750/MWh |
| AMP (via Urban Reserve (AssetCo 2) Limited) | 72.0 MW36.0 MW rejected | £28.8k | £400/MWh |
| GRIDIMP LTD | 55.0 MW172.0 MW rejected | £27.5k | £500/MWh |
| AXLE ENERGY LIMITED | 48.0 MW116.0 MW rejected | £27.3k | £560/MWh |
| ENGIE POWER LIMITED | 18.0 MW18.0 MW rejected | £9.0k | £500/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 18.0 MW | £4.5k | £252/MWh |
| GALLAGHER AGGREGATES LIMITED | 10.0 MW24.0 MW rejected | £3.4k | £340/MWh |
| CUB (UK) LTD | 6.0 MW33.0 MW rejected | £2.6k | £427/MWh |
| EQUIWATT LIMITED | 6.0 MW21.0 MW rejected | £2.4k | £400/MWh |
| OAKTREE POWER LIMITED | 2.0 MW2.0 MW rejected | £1.0k | £515/MWh |
| ORANGE POWER LTD | 2.0 MW2.0 MW rejected | £168 | £84/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 0.0 MW110.0 MW rejected | £0 | £1000/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW31.9 MW rejected | £0 | £475/MWhrej |