NESO called a Turn Down event on 6 Dec 2024, running from 16:00 to 19:00 across 6 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 17
accepted / total
Participants
4
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (4)
GRIDIMP 27.0 MW @ £500/MWhAXLE 14.0 MW @ £643/MWhCUB 8.0 MW @ £299/MWhEQUIWATT 3.0 MW @ £475/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| GRIDIMP LTD | 0.0 MW27.0 MW rejected | £0 | £500/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW14.0 MW rejected | £0 | £643/MWhrej |
| CUB (UK) LTD | 0.0 MW8.0 MW rejected | £0 | £299/MWhrej |
| EQUIWATT LIMITED | 0.0 MW3.0 MW rejected | £0 | £475/MWhrej |