DFS Monitorkilowatts.io
2024-12

10 Dec 2024

Turn Down

NESO called a Turn Down event on 10 Dec 2024, running from 16:00 to 19:00 across 6 half-hour settlement periods. 6.0 MW was procured against a 500.0 MW requirement (1% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
6.0 MW
1% of requirement
Bid Cost
£375
Bids
6 / 67
accepted / total
Participants
9

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (8)
OCTOPUS 168.6 MW @ £500/MWhINFINIS 96.0 MW @ £306/MWhGRIDIMP 27.0 MW @ £500/MWhENGIE 18.0 MW @ £500/MWhAXLE 14.0 MW @ £572/MWhCUB 6.0 MW @ £449/MWhGALLAGHER 6.0 MW @ £500/MWhEQUIWATT 3.0 MW @ £375/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
HILDEBRAND TECHNOLOGY LIMITED
6.0 MW
£750£125/MWh
OCTOPUS ENERGY LIMITED
0.0 MW168.6 MW rejected
£0£500/MWhrej
INFINIS LIMITED
0.0 MW96.0 MW rejected
£0£300/MWhrej
GRIDIMP LTD
0.0 MW27.0 MW rejected
£0£500/MWhrej
ENGIE POWER LIMITED
0.0 MW18.0 MW rejected
£0£500/MWhrej
AXLE ENERGY LIMITED
0.0 MW14.0 MW rejected
£0£572/MWhrej
CUB (UK) LTD
0.0 MW6.0 MW rejected
£0£449/MWhrej
GALLAGHER AGGREGATES LIMITED
0.0 MW6.0 MW rejected
£0£500/MWhrej
EQUIWATT LIMITED
0.0 MW3.0 MW rejected
£0£375/MWhrej