NESO called a Turn Down event on 11 Dec 2024, running from 16:00 to 19:00 across 6 half-hour settlement periods. 349.0 MW was procured against a 500.0 MW requirement (70% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
349.0 MW
70% of requirement
Bid Cost
£103.6k
Bids
70 / 70
accepted / total
Participants
9
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 168.0 MW | £126.0k | £750/MWh |
| INFINIS LIMITED | 96.0 MW | £39.9k | £411/MWh |
| GRIDIMP LTD | 27.0 MW | £13.5k | £500/MWh |
| ENGIE POWER LIMITED | 18.0 MW | £9.0k | £500/MWh |
| AXLE ENERGY LIMITED | 16.0 MW | £9.0k | £535/MWh |
| EQUIWATT LIMITED | 6.0 MW | £2.4k | £400/MWh |
| GALLAGHER AGGREGATES LIMITED | 6.0 MW | £1.8k | £300/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 6.0 MW | £3.0k | £508/MWh |
| CUB (UK) LTD | 6.0 MW | £2.6k | £427/MWh |