NESO called a Turn Down event on 27 Dec 2024, running from 17:00 to 19:00 across 4 half-hour settlement periods. 118.0 MW was procured against a 300.0 MW requirement (39% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
118.0 MW
39% of requirement
Bid Cost
£6.5k
Bids
22 / 34
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (3)
AXLE 13.0 MW @ £642/MWhUTILITA 6.6 MW @ £475/MWhEQUIWATT 2.0 MW @ £550/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
ProcuredSettledReq: 300.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 116.0 MW | £12.8k | £111/MWh |
| ORANGE POWER LTD | 2.0 MW2.0 MW rejected | £168 | £84/MWh |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW6.6 MW rejected | £0 | £475/MWhrej |
| EQUIWATT LIMITED | 0.0 MW2.0 MW rejected | £0 | £550/MWhrej |