NESO called a Turn Down event on 13 Dec 2024, running from 16:00 to 18:00 across 4 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 48
accepted / total
Participants
9
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (9)
OCTOPUS 136.7 MW @ £300/MWhINFINIS 116.0 MW @ £248/MWhDRAX 44.0 MW @ £1000/MWhAXLE 13.0 MW @ £642/MWhGRIDIMP 11.6 MW @ £500/MWhUTILITA 6.1 MW @ £475/MWhEQUIWATT 4.0 MW @ £500/MWhGALLAGHER 4.0 MW @ £500/MWhOAKTREE 2.0 MW @ £550/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 0.0 MW136.7 MW rejected | £0 | £300/MWhrej |
| INFINIS LIMITED | 0.0 MW116.0 MW rejected | £0 | £248/MWhrej |
| DRAX ENERGY SOLUTIONS LIMITED | 0.0 MW44.0 MW rejected | £0 | £1000/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |
| GRIDIMP LTD | 0.0 MW11.6 MW rejected | £0 | £500/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW6.1 MW rejected | £0 | £475/MWhrej |
| EQUIWATT LIMITED | 0.0 MW4.0 MW rejected | £0 | £500/MWhrej |
| GALLAGHER AGGREGATES LIMITED | 0.0 MW4.0 MW rejected | £0 | £500/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW2.0 MW rejected | £0 | £550/MWhrej |