NESO called a Turn Down event on 17 Jan 2025, running from 16:00 to 19:00 across 4 half-hour settlement periods. 4.0 MW was procured against a 500.0 MW requirement (1% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
4.0 MW
1% of requirement
Bid Cost
£270
Bids
4 / 41
accepted / total
Participants
9
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (8)
GRIDBEYOND 76.0 MW @ £538/MWhUTILITA 5.9 MW @ £475/MWhCUB 4.4 MW @ £229/MWhPERSE 4.2 MW @ £500/MWhGRIDIMP 4.0 MW @ £500/MWhOAKTREE 4.0 MW @ £575/MWhGALLAGHER 4.0 MW @ £300/MWhEQUIWATT 2.0 MW @ £450/MWh
Half-Hour Periods
16:00
16:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| HILDEBRAND TECHNOLOGY LIMITED | 4.0 MW | £540 | £135/MWh |
| GRIDBEYOND LIMITED | 0.0 MW76.0 MW rejected | £0 | £517/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW5.9 MW rejected | £0 | £475/MWhrej |
| CUB (UK) LTD | 0.0 MW4.4 MW rejected | £0 | £229/MWhrej |
| PERSE TECHNOLOGY LIMITED | 0.0 MW4.2 MW rejected | £0 | £500/MWhrej |
| GRIDIMP LTD | 0.0 MW4.0 MW rejected | £0 | £500/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW4.0 MW rejected | £0 | £575/MWhrej |
| GALLAGHER AGGREGATES LIMITED | 0.0 MW4.0 MW rejected | £0 | £300/MWhrej |
| EQUIWATT LIMITED | 0.0 MW2.0 MW rejected | £0 | £450/MWhrej |