NESO called a Turn Down event on 14 Jan 2025, running from 17:00 to 19:00 across 4 half-hour settlement periods. 213.5 MW was procured against a 300.0 MW requirement (71% fill rate), with 12 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
213.5 MW
71% of requirement
Bid Cost
£17.2k
Bids
29 / 76
accepted / total
Participants
12
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (9)
OCTOPUS 195.2 MW @ £250/MWhDRAX 24.0 MW @ £1000/MWhAXLE 11.0 MW @ £642/MWhOAKTREE 10.0 MW @ £1135/MWhGALLAGHER 8.0 MW @ £300/MWhPERSE 5.6 MW @ £500/MWhGRIDIMP 4.4 MW @ £500/MWhCUB 4.0 MW @ £500/MWhUTILITA 3.2 MW @ £475/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
ProcuredSettledReq: 300.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 140.5 MW | £22.5k | £160/MWh |
| GRIDBEYOND LIMITED | 72.0 MW4.0 MW rejected | £11.6k | £163/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 1.0 MW3.0 MW rejected | £180 | £180/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW195.2 MW rejected | £0 | £250/MWhrej |
| DRAX ENERGY SOLUTIONS LIMITED | 0.0 MW24.0 MW rejected | £0 | £1000/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW11.0 MW rejected | £0 | £642/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW10.0 MW rejected | £0 | £969/MWhrej |
| GALLAGHER AGGREGATES LIMITED | 0.0 MW8.0 MW rejected | £0 | £300/MWhrej |
| PERSE TECHNOLOGY LIMITED | 0.0 MW5.6 MW rejected | £0 | £500/MWhrej |
| GRIDIMP LTD | 0.0 MW4.4 MW rejected | £0 | £500/MWhrej |
| CUB (UK) LTD | 0.0 MW4.0 MW rejected | £0 | £500/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.2 MW rejected | £0 | £475/MWhrej |