DFS events called during Jan 2025, part of the winter Turn Down season. NESO called 10 events this month, of which 8 resulted in procured volume. Each event below shows the time window, volume procured versus requirement, cost, and number of participants. Click any event to see the full bid-level breakdown.
Event Days
10
8 with volume
Procured
2.67 GW
Settled Cost
£380.4k
Avg Price
£410/MWh
Events
29 Jan 202516:00–18:00Turn Down
164.0 MW procured of 500.0 MW · £9.0k · 11 participants · 24 accepted / 47 rejected · £110/MWh
33%
23 Jan 202516:00–19:00Turn Down
220.0 MW procured of 400.0 MW · £12.8k · 9 participants · 26 accepted / 51 rejected · £116/MWh
55%
22 Jan 202516:00–19:00Turn Down
607.7 MW procured of 500.0 MW · £197.7k · 10 participants · 71 accepted / 10 rejected · £651/MWh
122%
21 Jan 202516:00–19:00Turn Down
559.3 MW procured of 500.0 MW · £86.0k · 10 participants · 46 accepted / 46 rejected · £307/MWh
112%
20 Jan 202516:00–19:00Turn Down
156.0 MW procured of 500.0 MW · £23.9k · 11 participants · 28 accepted / 70 rejected · £307/MWh
31%
17 Jan 202516:00–19:00Turn Down
4.0 MW procured of 500.0 MW · £270 · 9 participants · 4 accepted / 37 rejected · £135/MWh
1%
14 Jan 202517:00–19:00Turn Down
213.5 MW procured of 300.0 MW · £17.2k · 12 participants · 29 accepted / 47 rejected · £161/MWh
71%
10 Jan 202516:00–19:00Turn Down
0.0 MW procured of 500.0 MW · £0 · 12 participants · 0 accepted / 100 rejected
8 Jan 202516:00–19:00Turn Down
746.6 MW procured of 500.0 MW · £200.2k · 11 participants · 92 accepted / 2 rejected · £536/MWh
149%
5 Jan 202516:00–18:00Turn Down
0.0 MW procured of 150.0 MW · £0 · 3 participants · 0 accepted / 16 rejected
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 1.44 GW368.0 MW rejected | £437.7k | £300/MWh |
| OCTOPUS ENERGY LIMITED | 692.9 MW1.16 GW rejected | £412.5k | £580/MWh |
| GRIDBEYOND LIMITED | 366.0 MW431.6 MW rejected | £131.3k | £375/MWh |
| DRAX ENERGY SOLUTIONS LIMITED | 36.0 MW156.0 MW rejected | £43.2k | £1200/MWh |
| GRIDIMP LTD | 36.0 MW81.4 MW rejected | £18.0k | £500/MWh |
| AXLE ENERGY LIMITED | 26.0 MW89.0 MW rejected | £18.0k | £691/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 15.0 MW9.0 MW rejected | £2.2k | £147/MWh |
| UTILITA ENERGY LIMITED | 14.3 MW45.3 MW rejected | £6.2k | £430/MWh |
| GALLAGHER AGGREGATES LIMITED | 12.0 MW32.0 MW rejected | £3.6k | £300/MWh |
| OAKTREE POWER LIMITED | 10.0 MW72.0 MW rejected | £5.1k | £513/MWh |
| CUB (UK) LTD | 10.0 MW34.6 MW rejected | £6.6k | £658/MWh |
| PERSE TECHNOLOGY LIMITED | 8.4 MW25.2 MW rejected | £4.2k | £500/MWh |
| EQUIWATT LIMITED | 8.0 MW16.0 MW rejected | £5.4k | £673/MWh |