29 Jan 2025

Turn Down

NESO called a Turn Down event on 29 Jan 2025, running from 16:00 to 18:00 across 4 half-hour settlement periods. 164.0 MW was procured against a 500.0 MW requirement (33% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
164.0 MW
33% of requirement
Bid Cost
£9.0k
Bids
24 / 71
accepted / total
Participants
11

Accepted Volume by Participant

Aggregated across 4 half-hour periods, sorted by accepted volume

All bids rejected (9)
OCTOPUS 259.3 MW @ £300/MWhGRIDBEYOND 57.6 MW @ £267/MWhDRAX 24.0 MW @ £1000/MWhGRIDIMP 15.6 MW @ £500/MWhAXLE 13.0 MW @ £642/MWhOAKTREE 12.0 MW @ £1046/MWhGALLAGHER 8.0 MW @ £300/MWhCUB 4.0 MW @ £649/MWhUTILITA 3.5 MW @ £340/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
160.0 MW
£17.6k£110/MWh
HILDEBRAND TECHNOLOGY LIMITED
4.0 MW
£500£125/MWh
OCTOPUS ENERGY LIMITED
0.0 MW259.3 MW rejected
£0£300/MWhrej
GRIDBEYOND LIMITED
0.0 MW57.6 MW rejected
£0£375/MWhrej
DRAX ENERGY SOLUTIONS LIMITED
0.0 MW24.0 MW rejected
£0£1000/MWhrej
GRIDIMP LTD
0.0 MW15.6 MW rejected
£0£500/MWhrej
AXLE ENERGY LIMITED
0.0 MW13.0 MW rejected
£0£642/MWhrej
OAKTREE POWER LIMITED
0.0 MW12.0 MW rejected
£0£972/MWhrej
GALLAGHER AGGREGATES LIMITED
0.0 MW8.0 MW rejected
£0£300/MWhrej
CUB (UK) LTD
0.0 MW4.0 MW rejected
£0£649/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.5 MW rejected
£0£340/MWhrej