NESO called a Turn Down event on 29 Jan 2025, running from 16:00 to 18:00 across 4 half-hour settlement periods. 164.0 MW was procured against a 500.0 MW requirement (33% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
164.0 MW
33% of requirement
Bid Cost
£9.0k
Bids
24 / 71
accepted / total
Participants
11
Accepted Volume by Participant
Aggregated across 4 half-hour periods, sorted by accepted volume
All bids rejected (9)
OCTOPUS 259.3 MW @ £300/MWhGRIDBEYOND 57.6 MW @ £267/MWhDRAX 24.0 MW @ £1000/MWhGRIDIMP 15.6 MW @ £500/MWhAXLE 13.0 MW @ £642/MWhOAKTREE 12.0 MW @ £1046/MWhGALLAGHER 8.0 MW @ £300/MWhCUB 4.0 MW @ £649/MWhUTILITA 3.5 MW @ £340/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 160.0 MW | £17.6k | £110/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 4.0 MW | £500 | £125/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW259.3 MW rejected | £0 | £300/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW57.6 MW rejected | £0 | £375/MWhrej |
| DRAX ENERGY SOLUTIONS LIMITED | 0.0 MW24.0 MW rejected | £0 | £1000/MWhrej |
| GRIDIMP LTD | 0.0 MW15.6 MW rejected | £0 | £500/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW12.0 MW rejected | £0 | £972/MWhrej |
| GALLAGHER AGGREGATES LIMITED | 0.0 MW8.0 MW rejected | £0 | £300/MWhrej |
| CUB (UK) LTD | 0.0 MW4.0 MW rejected | £0 | £649/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.5 MW rejected | £0 | £340/MWhrej |