NESO called a Turn Down event on 23 Jan 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 220.0 MW was procured against a 400.0 MW requirement (55% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
400.0 MW
Procured
220.0 MW
55% of requirement
Bid Cost
£12.8k
Bids
26 / 77
accepted / total
Participants
9
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (7)
OCTOPUS 274.9 MW @ £300/MWhGRIDIMP 23.4 MW @ £500/MWhAXLE 13.0 MW @ £642/MWhOAKTREE 12.0 MW @ £1132/MWhCUB 6.0 MW @ £500/MWhUTILITA 4.7 MW @ £340/MWhEQUIWATT 4.0 MW @ £375/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 400.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 160.0 MW80.0 MW rejected | £16.6k | £104/MWh |
| GRIDBEYOND LIMITED | 60.0 MW6.0 MW rejected | £9.0k | £150/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW274.9 MW rejected | £0 | £300/MWhrej |
| GRIDIMP LTD | 0.0 MW23.4 MW rejected | £0 | £500/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW12.0 MW rejected | £0 | £949/MWhrej |
| CUB (UK) LTD | 0.0 MW6.0 MW rejected | £0 | £500/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW4.7 MW rejected | £0 | £340/MWhrej |
| EQUIWATT LIMITED | 0.0 MW4.0 MW rejected | £0 | £375/MWhrej |