Turn Down

NESO called a Turn Down event on 25 Feb 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 542.3 MW was procured against a 500.0 MW requirement (108% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
542.3 MW
108% of requirement
Bid Cost
£39.0k
Bids
52 / 85
accepted / total
Participants
10

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (5)
AXLE 13.0 MW @ £642/MWhOAKTREE 10.0 MW @ £1013/MWhCUB 6.0 MW @ £595/MWhUTILITA 3.3 MW @ £340/MWhSSE 2.6 MW @ £490/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
OCTOPUS ENERGY LIMITED
278.9 MW
£44.6k£160/MWh
INFINIS LIMITED
190.2 MW
£23.3k£122/MWh
GRIDBEYOND LIMITED
43.2 MW24.0 MW rejected
£6.4k£149/MWh
GRIDIMP LTD
24.0 MW
£2.9k£120/MWh
HILDEBRAND TECHNOLOGY LIMITED
6.0 MW
£880£147/MWh
AXLE ENERGY LIMITED
0.0 MW13.0 MW rejected
£0£642/MWhrej
OAKTREE POWER LIMITED
0.0 MW10.0 MW rejected
£0£910/MWhrej
CUB (UK) LTD
0.0 MW6.0 MW rejected
£0£595/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.3 MW rejected
£0£340/MWhrej
SSE DIGITAL SERVICES LIMITED
0.0 MW2.6 MW rejected
£0£490/MWhrej