DFS Monitorkilowatts.io
2025-02

28 Feb 2025

Turn Down

NESO called a Turn Down event on 28 Feb 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 41.8 MW was procured against a 500.0 MW requirement (8% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
41.8 MW
8% of requirement
Bid Cost
£2.5k
Bids
16 / 53
accepted / total
Participants
9

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (7)
OCTOPUS 302.0 MW @ £150/MWhAXLE 13.0 MW @ £642/MWhCUB 6.0 MW @ £595/MWhHILDEBRAND 6.0 MW @ £147/MWhEQUIWATT 4.0 MW @ £450/MWhUTILITA 3.3 MW @ £340/MWhSSE 2.6 MW @ £490/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
GRIDBEYOND LIMITED
23.8 MW20.0 MW rejected
£2.9k£124/MWh
GRIDIMP LTD
18.0 MW
£2.2k£120/MWh
OCTOPUS ENERGY LIMITED
0.0 MW302.0 MW rejected
£0£150/MWhrej
AXLE ENERGY LIMITED
0.0 MW13.0 MW rejected
£0£642/MWhrej
CUB (UK) LTD
0.0 MW6.0 MW rejected
£0£595/MWhrej
HILDEBRAND TECHNOLOGY LIMITED
0.0 MW6.0 MW rejected
£0£147/MWhrej
EQUIWATT LIMITED
0.0 MW4.0 MW rejected
£0£450/MWhrej
UTILITA ENERGY LIMITED
0.0 MW3.3 MW rejected
£0£340/MWhrej
SSE DIGITAL SERVICES LIMITED
0.0 MW2.6 MW rejected
£0£490/MWhrej