NESO called a Turn Down event on 21 Nov 2025, running from 16:00 to 20:00 across 8 half-hour settlement periods. 171.7 MW was procured against a 1.00 GW requirement (17% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
1.00 GW
Procured
171.7 MW
17% of requirement
Bid Cost
£13.5k
Bids
30 / 30
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
ProcuredSettledReq: 1.00 GW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 125.5 MW | £18.1k | £139/MWh |
| OAKTREE POWER LIMITED | 34.0 MW | £7.5k | £222/MWh |
| EQUIWATT LIMITED | 12.2 MW | £1.5k | £120/MWh |