NESO called a Turn Down event on 25 Nov 2025, running from 16:00 to 20:00 across 8 half-hour settlement periods. 155.3 MW was procured against a 500.0 MW requirement (31% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
155.3 MW
31% of requirement
Bid Cost
£16.0k
Bids
4 / 36
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (2)
OAKTREE 34.0 MW @ £266/MWhGRIDBEYOND 24.0 MW @ £335/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 155.3 MW143.1 MW rejected | £32.1k | £205/MWh |
| OAKTREE POWER LIMITED | 0.0 MW34.0 MW rejected | £0 | £268/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW24.0 MW rejected | £0 | £335/MWhrej |