NESO called a Turn Down event on 16 Apr 2026, running from 17:00 to 21:00 across 8 half-hour settlement periods. 194.0 MW was procured against a 500.0 MW requirement (39% fill rate), with 2 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
194.0 MW
39% of requirement
Bid Cost
£11.9k
Bids
40 / 62
accepted / total
Participants
2
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (1)
EQUIWATT 23.6 MW @ £250/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 194.0 MW | £23.8k | £123/MWh |
| EQUIWATT LIMITED | 0.0 MW23.6 MW rejected | £0 | £250/MWhrej |