NESO called a Turn Up event on 26 Apr 2026, running from 11:00 to 22:00 across 18 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 0 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Procured
0.0 MW
0% of requirement
Bids
0 / 0
accepted / total
Half-Hour Periods 11:00
11:00–11:30
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
11:30
11:30–12:00
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
12:00
12:00–12:30
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
12:30
12:30–13:00
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
13:00
13:00–13:30
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
13:30
13:30–14:00
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
14:00
14:00–14:30
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
14:30
14:30–15:00
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
15:00
15:00–15:30
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
15:30
15:30–16:00
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
18:00
18:00–18:30
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
18:30
18:30–19:00
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
19:00
19:00–19:30
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
19:30
19:30–20:00
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
20:00
20:00–20:30
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
20:30
20:30–21:00
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
21:00
21:00–21:30
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
21:30
21:30–22:00
Procured: 0.0 MW
Settled: 0.0 MW
0 / 0 bids
Procured SettledReq: 500.0 MW per period