NESO called a Turn Down event on 27 Apr 2026, running from 17:00 to 21:00 across 8 half-hour settlement periods. 281.8 MW was procured against a 500.0 MW requirement (56% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
281.8 MW
56% of requirement
Bid Cost
£17.7k
Bids
74 / 78
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 268.8 MW | £33.7k | £127/MWh |
| EQUIWATT LIMITED | 12.2 MW | £1.6k | £135/MWh |
| OAKTREE POWER LIMITED | 0.8 MW0.8 MW rejected | £96 | £120/MWh |