NESO called a Turn Down event on 12 Aug 2026, running from 17:00 to 22:00 across 10 half-hour settlement periods. 595.9 MW was procured against a 500.0 MW requirement (119% fill rate), with 6 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
595.9 MW
119% of requirement
Bid Cost
£60.5k
Bids
221 / 225
accepted / total
Participants
6
Accepted Volume by Participant
Aggregated across 10 half-hour periods, sorted by accepted volume
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 423.9 MW | £80.4k | £188/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 108.7 MW | £21.0k | £191/MWh |
| AXLE ENERGY LIMITED | 43.4 MW0.4 MW rejected | £15.6k | £418/MWh |
| EQUIWATT LIMITED | 18.0 MW | £3.6k | £199/MWh |
| U ENERGY GROUP LIMITED | 1.5 MW0.1 MW rejected | £321 | £213/MWh |
| OAKTREE POWER LIMITED | 0.4 MW0.2 MW rejected | £90 | £226/MWh |