NESO called a Turn Down event on 13 Aug 2026, running from 17:00 to 21:00 across 8 half-hour settlement periods. 22.8 MW was procured against a 500.0 MW requirement (5% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
22.8 MW
5% of requirement
Bid Cost
£2.7k
Bids
98 / 147
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 8 half-hour periods, sorted by accepted volume
All bids rejected (2)
INFINIS 336.3 MW @ £315/MWhAXLE 14.4 MW @ £477/MWh
Half-Hour Periods
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| EQUIWATT LIMITED | 16.0 MW | £4.0k | £250/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 6.4 MW | £1.4k | £217/MWh |
| OAKTREE POWER LIMITED | 0.4 MW0.2 MW rejected | £84 | £210/MWh |
| INFINIS LIMITED | 0.0 MW336.3 MW rejected | £0 | £316/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW14.4 MW rejected | £0 | £532/MWhrej |