NESO called a Turn Down event on 14 Aug 2026, running from 21:00 to 22:00 across 2 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 5 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 63
accepted / total
Participants
5
Accepted Volume by Participant
Aggregated across 2 half-hour periods, sorted by accepted volume
All bids rejected (5)
INFINIS 50.6 MW @ £175/MWhAXLE 18.5 MW @ £354/MWhEQUIWATT 7.8 MW @ £450/MWhHILDEBRAND 1.8 MW @ £177/MWhU 0.2 MW @ £195/MWh
Half-Hour Periods
21:00
21:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 0.0 MW50.6 MW rejected | £0 | £175/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW18.5 MW rejected | £0 | £365/MWhrej |
| EQUIWATT LIMITED | 0.0 MW7.8 MW rejected | £0 | £450/MWhrej |
| HILDEBRAND TECHNOLOGY LIMITED | 0.0 MW1.8 MW rejected | £0 | £177/MWhrej |
| U ENERGY GROUP LIMITED | 0.0 MW0.2 MW rejected | £0 | £195/MWhrej |