NESO called a Turn Down event on 7 Sep 2026, running from 16:00 to 22:00 across 12 half-hour settlement periods. 451.6 MW was procured against a 300.0 MW requirement (151% fill rate), with 8 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
300.0 MW
Procured
451.6 MW
151% of requirement
Bid Cost
£40.0k
Bids
242 / 242
accepted / total
Participants
8
Accepted Volume by Participant
Aggregated across 12 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
ProcuredSettledReq: 300.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 218.8 MW | £39.1k | £175/MWh |
| OCTOPUS ENERGY LIMITED | 182.5 MW | £31.0k | £170/MWh |
| AXLE ENERGY LIMITED | 22.1 MW | £4.7k | £221/MWh |
| EQUIWATT LIMITED | 14.0 MW | £2.8k | £198/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 10.4 MW | £1.8k | £172/MWh |
| U ENERGY GROUP LIMITED | 1.8 MW | £329 | £184/MWh |
| Shuffle Energy Limited | 1.2 MW | £210 | £175/MWh |
| OAKTREE POWER LIMITED | 0.8 MW | £170 | £213/MWh |