NESO called a Turn Up event on 9 Oct 2026, running from 16:00 to 16:00 across 24 half-hour settlement periods. 52.6 MW was procured against a 500.0 MW requirement (11% fill rate), with 3 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
52.6 MW
11% of requirement
Bid Cost
£1.5k
Bids
36 / 100
accepted / total
Participants
3
Accepted Volume by Participant
Aggregated across 24 half-hour periods, sorted by accepted volume
All bids rejected (1)
GRIDVOLT 2.3 MW @ £138/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| OCTOPUS ENERGY LIMITED | 49.6 MW | £3.0k | £60/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 3.0 MW4.2 MW rejected | £93 | £31/MWh |
| GRIDVOLT UK LIMITED | 0.0 MW2.3 MW rejected | £0 | £134/MWhrej |