NESO called a Turn Down event on 29 Oct 2026, running from 16:00 to 23:00 across 26 half-hour settlement periods. 443.0 MW was procured against a 500.0 MW requirement (89% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
443.0 MW
89% of requirement
Bid Cost
£54.0k
Bids
320 / 320
accepted / total
Participants
10
Accepted Volume by Participant
Aggregated across 26 half-hour periods, sorted by accepted volume
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 347.6 MW | £84.9k | £241/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 32.0 MW | £7.0k | £189/MWh |
| ENGIE POWER LIMITED | 27.6 MW | £6.9k | £251/MWh |
| EQUIWATT LIMITED | 16.0 MW | £4.4k | £275/MWh |
| AXLE ENERGY LIMITED | 14.4 MW | £3.9k | £274/MWh |
| Shuffle Energy Limited | 2.6 MW | £338 | £130/MWh |
| U ENERGY GROUP LIMITED | 1.2 MW | £287 | £239/MWh |
| OAKTREE POWER LIMITED | 0.8 MW | £222 | £277/MWh |
| GRIDVOLT UK LIMITED | 0.6 MW | £29 | £48/MWh |
| Bryt Energy Limited | 0.2 MW | £48 | £238/MWh |