NESO called a Turn Down event on 29 Oct 2026, running from 16:00 to 23:00 across 26 half-hour settlement periods. 443.0 MW was procured against a 500.0 MW requirement (89% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
443.0 MW
89% of requirement
Bid Cost
£54.0k
Bids
320 / 320
accepted / total
Participants
10

Accepted Volume by Participant

Aggregated across 26 half-hour periods, sorted by accepted volume

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
347.6 MW
£84.9k£241/MWh
HILDEBRAND TECHNOLOGY LIMITED
32.0 MW
£7.0k£189/MWh
ENGIE POWER LIMITED
27.6 MW
£6.9k£251/MWh
EQUIWATT LIMITED
16.0 MW
£4.4k£275/MWh
AXLE ENERGY LIMITED
14.4 MW
£3.9k£274/MWh
Shuffle Energy Limited
2.6 MW
£338£130/MWh
U ENERGY GROUP LIMITED
1.2 MW
£287£239/MWh
OAKTREE POWER LIMITED
0.8 MW
£222£277/MWh
GRIDVOLT UK LIMITED
0.6 MW
£29£48/MWh
Bryt Energy Limited
0.2 MW
£48£238/MWh