NESO called a Turn Down event on 30 Oct 2026, running from 16:00 to 16:00 across 34 half-hour settlement periods. 345.8 MW was procured against a 500.0 MW requirement (69% fill rate), with 9 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
345.8 MW
69% of requirement
Bid Cost
£40.5k
Bids
205 / 282
accepted / total
Participants
9
Accepted Volume by Participant
Aggregated across 34 half-hour periods, sorted by accepted volume
All bids rejected (1)
AXLE 38.9 MW @ £276/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 275.7 MW | £64.9k | £232/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 29.5 MW4.8 MW rejected | £6.9k | £235/MWh |
| ENGIE POWER LIMITED | 23.0 MW | £4.8k | £209/MWh |
| EQUIWATT LIMITED | 14.8 MW | £3.7k | £252/MWh |
| Shuffle Energy Limited | 1.0 MW | £200 | £200/MWh |
| U ENERGY GROUP LIMITED | 1.0 MW | £231 | £231/MWh |
| GRIDVOLT UK LIMITED | 0.4 MW1.6 MW rejected | £97 | £242/MWh |
| Bryt Energy Limited | 0.4 MW | £96 | £240/MWh |
| AXLE ENERGY LIMITED | 0.0 MW38.9 MW rejected | £0 | £277/MWhrej |