Turn DownTurn Up

NESO called a Turn Down event on 31 Oct 2026, running from 16:00 to 16:00 across 20 half-hour settlement periods. 37.6 MW was procured against a 500.0 MW requirement (8% fill rate), with 4 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
37.6 MW
8% of requirement
Bid Cost
£4.5k
Bids
119 / 154
accepted / total
Participants
4

Accepted Volume by Participant

Aggregated across 20 half-hour periods, sorted by accepted volume

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
HILDEBRAND TECHNOLOGY LIMITED
34.7 MW6.1 MW rejected
£8.3k£238/MWh
Shuffle Energy Limited
1.0 MW
£200£200/MWh
U ENERGY GROUP LIMITED
1.0 MW
£234£234/MWh
GRIDVOLT UK LIMITED
0.9 MW0.9 MW rejected
£211£235/MWh