NESO called 3 Turn Down events on 11 Nov 2026, running from 11:00 to 21:00 across 20 half-hour settlement periods. 867.8 MW was procured against a 1.00 GW requirement (87% fill rate), with 7 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
1.00 GW
Procured
867.8 MW
87% of requirement
Bid Cost
£117.6k
Bids
248 / 307
accepted / total
Participants
7
Accepted Volume by Participant
Aggregated across 30 half-hour periods, sorted by accepted volume
All bids rejected (1)
AXLE 45.3 MW @ £365/MWh
Half-Hour Periods
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
ProcuredSettledReq: up to 1.00 GW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 435.6 MW | £117.7k | £259/MWh |
| OCTOPUS ENERGY LIMITED | 315.4 MW | £87.5k | £268/MWh |
| HILDEBRAND TECHNOLOGY LIMITED | 88.7 MW | £21.7k | £245/MWh |
| ENGIE POWER LIMITED | 23.0 MW | £6.8k | £297/MWh |
| EQUIWATT LIMITED | 4.9 MW14.3 MW rejected | £1.5k | £300/MWh |
| Bryt Energy Limited | 0.2 MW0.2 MW rejected | £60 | £300/MWh |
| AXLE ENERGY LIMITED | 0.0 MW45.3 MW rejected | £0 | £356/MWhrej |