NESO called a Turn Down event on 12 Dec 2024, running from 16:00 to 19:00 across 6 half-hour settlement periods. 143.0 MW was procured against a 500.0 MW requirement (29% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
143.0 MW
29% of requirement
Bid Cost
£33.2k
Bids
38 / 89
accepted / total
Participants
10
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (4)
OCTOPUS 164.2 MW @ £700/MWhDRAX 66.0 MW @ £1000/MWhCUB 6.0 MW @ £825/MWhEQUIWATT 3.0 MW @ £900/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| AMP (via Urban Reserve (AssetCo 2) Limited) | 72.0 MW36.0 MW rejected | £28.8k | £400/MWh |
| INFINIS LIMITED | 36.0 MW108.0 MW rejected | £19.4k | £544/MWh |
| GRIDIMP LTD | 16.0 MW8.0 MW rejected | £8.0k | £500/MWh |
| AXLE ENERGY LIMITED | 13.0 MW | £7.4k | £572/MWh |
| GALLAGHER AGGREGATES LIMITED | 4.0 MW2.0 MW rejected | £1.6k | £400/MWh |
| OAKTREE POWER LIMITED | 2.0 MW | £1.0k | £515/MWh |
| OCTOPUS ENERGY LIMITED | 0.0 MW164.2 MW rejected | £0 | £700/MWhrej |
| DRAX ENERGY SOLUTIONS LIMITED | 0.0 MW66.0 MW rejected | £0 | £1000/MWhrej |
| CUB (UK) LTD | 0.0 MW6.0 MW rejected | £0 | £825/MWhrej |
| EQUIWATT LIMITED | 0.0 MW3.0 MW rejected | £0 | £900/MWhrej |