DFS Monitorkilowatts.io
2024-12

12 Dec 2024

Turn Down

NESO called a Turn Down event on 12 Dec 2024, running from 16:00 to 19:00 across 6 half-hour settlement periods. 143.0 MW was procured against a 500.0 MW requirement (29% fill rate), with 10 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
143.0 MW
29% of requirement
Bid Cost
£33.2k
Bids
38 / 89
accepted / total
Participants
10

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

All bids rejected (4)
OCTOPUS 164.2 MW @ £700/MWhDRAX 66.0 MW @ £1000/MWhCUB 6.0 MW @ £825/MWhEQUIWATT 3.0 MW @ £900/MWh

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
AMP (via Urban Reserve (AssetCo 2) Limited)
72.0 MW36.0 MW rejected
£28.8k£400/MWh
INFINIS LIMITED
36.0 MW108.0 MW rejected
£19.4k£544/MWh
GRIDIMP LTD
16.0 MW8.0 MW rejected
£8.0k£500/MWh
AXLE ENERGY LIMITED
13.0 MW
£7.4k£572/MWh
GALLAGHER AGGREGATES LIMITED
4.0 MW2.0 MW rejected
£1.6k£400/MWh
OAKTREE POWER LIMITED
2.0 MW
£1.0k£515/MWh
OCTOPUS ENERGY LIMITED
0.0 MW164.2 MW rejected
£0£700/MWhrej
DRAX ENERGY SOLUTIONS LIMITED
0.0 MW66.0 MW rejected
£0£1000/MWhrej
CUB (UK) LTD
0.0 MW6.0 MW rejected
£0£825/MWhrej
EQUIWATT LIMITED
0.0 MW3.0 MW rejected
£0£900/MWhrej