Turn Down

NESO called a Turn Down event on 8 Jan 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 746.6 MW was procured against a 500.0 MW requirement (149% fill rate), with 11 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.

Requirement
500.0 MW
Procured
746.6 MW
149% of requirement
Bid Cost
£200.2k
Bids
92 / 94
accepted / total
Participants
11

Accepted Volume by Participant

Aggregated across 6 half-hour periods, sorted by accepted volume

Half-Hour Periods

16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period

Requirement vs Procured by Period

Participants

ParticipantVolumeCostAvg Price
INFINIS LIMITED
360.0 MW
£114.6k£318/MWh
OCTOPUS ENERGY LIMITED
181.4 MW
£163.3k£900/MWh
GRIDBEYOND LIMITED
114.0 MW
£47.8k£444/MWh
DRAX ENERGY SOLUTIONS LIMITED
36.0 MW
£43.2k£1200/MWh
AXLE ENERGY LIMITED
13.0 MW
£9.6k£740/MWh
GRIDIMP LTD
12.6 MW
£6.3k£500/MWh
GALLAGHER AGGREGATES LIMITED
12.0 MW
£3.6k£300/MWh
UTILITA ENERGY LIMITED
9.6 MW
£4.6k£475/MWh
CUB (UK) LTD
4.0 MW
£3.6k£895/MWh
EQUIWATT LIMITED
2.0 MW2.0 MW rejected
£2.6k£1290/MWh
OAKTREE POWER LIMITED
2.0 MW
£1.3k£633/MWh