NESO called a Turn Down event on 10 Jan 2025, running from 16:00 to 19:00 across 6 half-hour settlement periods. 0.0 MW was procured against a 500.0 MW requirement (0% fill rate), with 12 participants submitting bids. The merit order chart below shows accepted and rejected volumes by participant, sorted by who delivered the most.
Requirement
500.0 MW
Procured
0.0 MW
0% of requirement
Bid Cost
£0
Bids
0 / 100
accepted / total
Participants
12
Accepted Volume by Participant
Aggregated across 6 half-hour periods, sorted by accepted volume
All bids rejected (12)
INFINIS 214.0 MW @ £553/MWhOCTOPUS 189.0 MW @ £500/MWhGRIDBEYOND 114.0 MW @ £500/MWhDRAX 36.0 MW @ £1000/MWhAXLE 13.0 MW @ £642/MWhGALLAGHER 12.0 MW @ £300/MWhPERSE 8.4 MW @ £690/MWhHILDEBRAND 6.0 MW @ £212/MWhOAKTREE 6.0 MW @ £1294/MWhCUB 5.2 MW @ £648/MWhEQUIWATT 4.0 MW @ £600/MWhUTILITA 3.4 MW @ £880/MWh
Half-Hour Periods
16:00
16:30
17:00
17:30
18:00
18:30
ProcuredSettledReq: 500.0 MW per period
Requirement vs Procured by Period
Participants
| Participant | Volume | Cost | Avg Price |
|---|---|---|---|
| INFINIS LIMITED | 0.0 MW214.0 MW rejected | £0 | £553/MWhrej |
| OCTOPUS ENERGY LIMITED | 0.0 MW189.0 MW rejected | £0 | £500/MWhrej |
| GRIDBEYOND LIMITED | 0.0 MW114.0 MW rejected | £0 | £633/MWhrej |
| DRAX ENERGY SOLUTIONS LIMITED | 0.0 MW36.0 MW rejected | £0 | £1000/MWhrej |
| AXLE ENERGY LIMITED | 0.0 MW13.0 MW rejected | £0 | £642/MWhrej |
| GALLAGHER AGGREGATES LIMITED | 0.0 MW12.0 MW rejected | £0 | £300/MWhrej |
| PERSE TECHNOLOGY LIMITED | 0.0 MW8.4 MW rejected | £0 | £690/MWhrej |
| HILDEBRAND TECHNOLOGY LIMITED | 0.0 MW6.0 MW rejected | £0 | £212/MWhrej |
| OAKTREE POWER LIMITED | 0.0 MW6.0 MW rejected | £0 | £1294/MWhrej |
| CUB (UK) LTD | 0.0 MW5.2 MW rejected | £0 | £648/MWhrej |
| EQUIWATT LIMITED | 0.0 MW4.0 MW rejected | £0 | £600/MWhrej |
| UTILITA ENERGY LIMITED | 0.0 MW3.4 MW rejected | £0 | £880/MWhrej |